2024-3-18 4081 Polk Co Bridge Get link Facebook X Pinterest Email Other Apps March 19, 2024 Arrived at 9:05am contractor was cutting back bank on the southeast side of bridge and placing material on south approach of bridge. Contractor has cut in ditch along northwest side of roadway on the north end Get link Facebook X Pinterest Email Other Apps Comments
2024-4-9 Polk Co Bridge April 12, 2024 Herman and Collins arrived ready to set guardrail in place Collins and Herman continue to place guardrail Read more
Comments
Post a Comment