2024-4-9 Polk Co Bridge

Image
Herman and Collins arrived ready to set guardrail in place Collins and Herman continue to place guardrail 

4-10-2024 4081 Polk Co Bridge

Image
  Arrived at 7:45am Contractor was building fence, working on Sloulders and seeding. Sub (Collins & Hermann was installing Guardrail, rain moved in and called it. will be back tomorrow morning to finish.

2024-3-20 4081 Polk Co Bridge

Image
  Arrived on site at 1:00pm, Contractor was working on roadway and side slopes Slope work on northwest corner

2024-3-18 4081 Polk Co Bridge

Image
Arrived at 9:05am contractor was cutting back bank on the southeast side of bridge and placing material on south approach of bridge.  Contractor has cut in ditch along northwest side of roadway on the north end 

2024-3-12 4081 Polk Co Bridge

Image
Arrived onsite at 1:30pm contractor was removing old roadway on the north end of bridge. Contractor will be working on both roadway to get ready for new asphalt on Monday.

2024-2-26 4081 Polk Co Bridge

Image
Arrived at 1:10, contractor was removing form work from Corral rail and walkways